Hotel Vessel Wind Solution, increase of cabin capacity

Hotel Vessel Wind Solution, increase of cabin capacity

To increase the capacity of offshore accommodation for service personnel during offshore construction and commissioning of Wind Parks and other offshore construction activities, an additional 20 cabins of a high standard was arranged.
KNUD E. HANSEN A/S has assisted C-bed from the first ideas to the final solution, follow up on board during the yard stay and as-built documentation.

The work was carried out at Fayard’s facilities in Denmark during December 2014.

Main Particulars

  • Length o.a. 123,45 m
  • Breadth 19,61 m
  • Draught 5,25 m
  • IMO number 6918560

Scope of Work

  • Inspection on board together with the owner, looking into details and selecting the best solutions
  • Creation of principle arrangements for different possible solutions
  • Detailed arrangements of final solution with arrangement in each cabin
  • Re-arrangement of existing sprinklers and fire detectors in cabins and corridors
  • Re-arrangement of firefighting equipment
  • Updating safety control plan
  • Re-location and increase of PA System Arrangement
  • Re-location and new installations of electrical outfitting
  • Updating insulation arrangement for Class approval
  • Principle HVAC arrangement
  • Weight calculation for conversion
  • New room number plan for all cabins on board
  • New Passenger Safety Instruction for all passenger and crew cabins on board
  • On board assistance during yard stay
  • Check of final arrangement on board and updating as-build documentation

KEH 14076

Hotel Vessel Wind Soluti On _ Increase Of Cabin Capacity _conversion Of Ferry _knud E Hansen As _1

Hotel Vessel Wind Soluti On _ Increase Of Cabin Capacity _conversion Of Ferry _knud E Hansen As _2

Images by C-bed

Other vessels in this area