PROJECT OVERVIEW
- VESSEL TYPE: Special Purpose vessels
- Vessel name: Floating Hotel
Scope of Work
- Tender Design
Project specification
Download specification![](https://www.knudehansen.com/wp-content/uploads/2017/10/Floating_Hotel_Nine_levels_by_Knud_E_Hansen.jpg)
The floating hotel is formed by nine levels. Each level consists of a ‘ring’ of suites around an atrium.
The hotel is arranged with a reception area including administration and accountancy offices, shops, hairdresser’s saloon, travel agency, bank facilities, restaurants and conference rooms. A sun deck with swimming pool, fitness area and pool bar is arranged. The hotel is arranged with a central supply area for various stores and provision and a main laundry. A lounge room and a self-service restaurant for the personnel is arranged near the galley area.
Main Particulars
- Length o.a. 147,40 m
- Breadth moulded 63,00 m
- Design draught 4,00 m
KEH87075
Capacity
- Number of suites 384
- Lobby area 150 seats
- Coffee shops 200 seats
- Restaurant 200 seats
- Pub area 105 seats
- Sun deck area 200 seats
Power supply
- The electrical load for the hotel is via a shore connection.
- Two independent emergency diesel generators will cover the emergency power supply.
Miscellaneous
+1A1 DNV R5, Barge, GMD Hotel Barge
Gallery
![](https://www.knudehansen.com/wp-content/uploads/2017/10/Floating_Hotel_Nine_levels.jpg)
![](https://www.knudehansen.com/wp-content/uploads/2017/10/Floating_Hotel_Nine_levels_Knud_E_Hansen_design.jpg)
![](https://www.knudehansen.com/wp-content/uploads/2017/10/Design_of_Floating_Hotel_nine_levels.jpg)
CONTACT US
GET IN TOUCH WITH OUR EXPERTS TO GET QUALIFIED ADVICE ABOUT YOUR IDEAS OR NEEDS
Related references
Contact us
![](https://www.knudehansen.com/wp-content/uploads/2017/09/contyact-person-370x250.jpg)
Finn Wollesen
Managing Director
- PHONE: +4532643069
- MOBILE: +4540842575
- EMAIL: contact@knudehansen.com